20pcs 450V 22uf 105 Long Leads Axial Electrolytic Polarized Capacitor Kit for Industrial Electrical
All taxes included | Tracking provided
Check delivery date & COD availability for your area
Secured Transaction — 256-bit SSL Encrypted Payment
We'll notify you the moment the price drops. No spam — one email, one alert.
US Store
Authentic source
Ships to India
Free shipping
12-21 Days
With tracking
Payment methods
20pcs 450V 22uf 105 Long Leads Axial Electrolytic Polariz… — Now in India
₹3,299
Our Price
₹2,817.36
✓ Customs & duties included · ✓ Free tracked delivery · ✓ Priority support
Secure Checkout
1-Year Warranty
Easy Returns
Tracked Delivery
US → India delivery timeline
Tracking providedDispatch
2–4 days
Transit
8–14 days
Delivery
12–21 days
Typical US→India timelines. Customs or weather can add variance. We notify proactively.
No description available.
Common Questions
Is this product genuine and authentic?
How long does delivery take to India?
Are customs duties and taxes included in the price?
What is the return policy?
What customers say
★★★★★
“Bought on PoshAce to save vs Amazon. Tracking was clear the whole way.”
— Ria, Bengaluru
Verified Buyer★★★★★
“Saved ₹2,400 vs Amazon India on the same model. Legit product, sealed box.”
— Rohan, Chennai
Verified Buyer★★★★★
“First time buying internationally. Customs and duties were included. No surprises.”
— Ananya, Kolkata
Verified Buyer★★★★★
“Compared 3 sites. PoshAce was ₹1,800 cheaper. Shipped and tracked as promised.”
— Aditya, Lucknow
Verified Buyer★★★★★
“GST invoice was ready the same day. Perfect for business expense claims.”
— Nisha, Bhopal
Verified Buyer★★★★★
“I've ordered 4 times now. Consistent quality and pricing every single time.”
— Swati, Kochi
Verified BuyerQuick Overview
- ✓Specification Quantity: 20pcs; Color: black; Weight: about 79g
- ✓Operating Voltage: DC450V; Capacity: 22uf
- ✓Multi Functional: This polarized capacitor is heat low leakage, low loss and low impedance.
- ✓Excellent Performance: electrolytic capacitors, service life of more than 3000H
- ✓Widely Used: Suitable for electronic applications such as game consoles, DIY projects, TVs, radios, prototypes, LCD monitors, etc. It is the best choice for electronic professionals or hobbyists.




